File #: 25-0207    Version: 1
Type: Resolution Status: Approved
File created: 4/16/2025 In control: Board of Hennepin County Commissioners
On agenda: 4/22/2025 Final action: 5/6/2025
Title: Schematic design approval and award contract PR00007307 to Mohagen Hansen Architecture for architectural and engineering services, 05/01/25-12/31/26; Award construction contracts for the JDC Elevator Assessment and Replacement.
Attachments: 1. RESOLUTION
Item Description:
title
Schematic design approval and award contract PR00007307 to Mohagen Hansen Architecture for architectural and engineering services, 05/01/25-12/31/26; Award construction contracts for the JDC Elevator Assessment and Replacement.
end

Resolution:
body
BE IT RESOLVED, that the following actions be approved for the JDC Elevator Assessment and Replacement (Project Number 1011282):

* Approval of schematic design;
* Authorization to proceed with architectural services for design development through construction phases;
* Authorization to advertise and receive construction proposals;
* Authorization to proceed with contracts that include general, mechanical and electrical construction;
* Authorization to use contracted service vendors and commodity contracts as necessary for portions of the work, furnishings and equipment; and

BE IT FURTHER RESOLVED, that Contract PR00007307 with Mohagen Hansen Architecure for architectural and engineering services for the design development through construction phases of the JDC Elevator Assessment and Replacement project (Project Number 1011282) for the period May 1, 2025 through December 31, 2026, in an amount not to exceed $180,879 be approved; that the Chair of the Board be authorized to sign the contract on behalf of the county; and that the Controller be authorized to disburse funds as directed; and

BE IT FURTHER RESOLVED, that the County Administrator be authorized to award a contract to a contractor offering the best value if the proposal is within the approved project budget; that the Chair of the Board be authorized to sign the contact on behalf of the county after the performance and payment bonds have been properly executed; and that the Controller be authorized to disburse funds as directed.
end

Background:
This project will refurbish and upgrade the elevators at the Juvenile Detention Center (JDC) located at 510 Park Avenue South, which was constructed in 1982. The facility occupies 16,313...